East Campus Parking Lot
The razing of Strawn and Carson Cottages allows for improvements to the east side of campus, including additional parking and lighting and safer pedestrian walkways.
The project is expected to be concluded by the first week of the semester.
June 5 Updates
- Fencing has been installed, materials delivered and utilities located.
- TPermits have been received; Triangle has set up the mandatory Pre-Construction meeting with the City for Thursday June 11.
- Construction cannot begin until after pre-construction meeting.
- Do to concerns with safety, with materials, equipment and test holes, the site cannot be re-opened for use. Anyone has the right to close a gate if they see it open.
- Triangle is working on the schedule to see what impacts the delays may have on the amount of parking available at the start of semester.
- Coordination is underway to get some additional directional signs up for pedestrians and vehicles prior to Alumni weekend.
May 29 Updates
- Fencing has been installed, materials delivered and utilities located.
- There has been a delay in the release of the permit from the City of Frederick that we are waiting on, but is anticipated for the week of June 1st. This has prevented further construction activities. (There would have been some delays due to the rain as well).
- Do to concerns with safety, with materials, equipment and test holes, the site cannot be re-opened for use.
Triangle is working on the schedule to see what impacts the delays may have on the amount of parking available at the start of semester. - Coordination is underway to get some additional directional signs up for pedestrians and vehicles prior to Alumni weekend.
May 7 Updates
- Construction crew will start install on May 19, with tree removal and Phase I roadway work during the week of May 19.
- All cars must be moved from that lot by noon on Sunday, May 18 or risk being towed.
April 30 Updates
- Fencing will be installed around the gravel lot and the Chapel lot sometime in the next two weeks to ensure the site is ready for construction to begin on May 19. Both lots will still be available for parking.
- Beginning May 19, the gravel lot and the Chapel lot will be closed. All cars must be moved from that lot by noon on Sunday, May 18 or risk being towed.
- The lot closures will prevent through-access to Blazer Hall from the the southeast side of campus; detour signs will be in place, directing you to use Hodson Drive to Blazer Trail.